Our work

Before.After.

Drag any handle to compare. Every photo is from a finished job, taken from the same spot.

  • A colonial house with an old, mossy shingle roof, and the same house with a new charcoal roof.
    BeforeAfter

    Full re-roof, colonial house

    Twenty-two years of moss and curl, replaced with a charcoal architectural shingle and new ridge vent in two days. The owners stayed home throughout.

    Where
    Maple Street, Cedar Ridge
    Material
    Architectural shingles, charcoal
    Time on site
    2 days
  • A ranch house roof with shingles torn off by wind, and the same roof repaired.
    BeforeAfter

    Wind damage, ranch house

    A spring windstorm stripped half the south slope. We tarped it the same night, met the adjuster two days later and rebuilt the slope in one day, fully covered by the claim.

    Where
    Orchard Lane, Millbrook
    Material
    Weathered-wood shingles
    Time on site
    1 day + claim
  • An old cracked flat roof with ponding water, and the same roof with a new white membrane.
    BeforeAfter

    TPO flat roof, retail unit

    A blistered bitumen roof with water pooling over the shop floor. New tapered insulation, a welded TPO membrane and fresh coping, done at night so the shop never closed.

    Where
    Foundry Row, Cedar Ridge
    Material
    White TPO membrane
    Time on site
    4 days
  • A barn-style house with faded green shingles, and the same house with a dark bronze metal roof.
    BeforeAfter

    Standing-seam metal, barn house

    The owners wanted a roof they would never replace. Dark bronze standing seam, snow guards over the porch and hidden fasteners all the way up.

    Where
    Hollow Road, Ashby
    Material
    Dark bronze standing seam
    Time on site
    3 days
  • A slate roof with cracked and missing slates, and the same roof restored.
    BeforeAfter

    Slate restoration, brick house

    Thirty-one cracked and slipped slates replaced with reclaimed stone of the same colour, new lead flashing around the chimney and the valleys relined.

    Where
    Church Hill, Old Ashby
    Material
    Natural grey slate
    Time on site
    5 days
  • Rusted sagging gutters, and the same eave with new copper gutters.
    BeforeAfter

    Copper gutters, craftsman house

    Rusted steel gutters pulling off the fascia, replaced with half-round copper on hidden hangers and new downspouts carried well clear of the foundation.

    Where
    Birch Court, Millbrook
    Material
    Half-round copper
    Time on site
    1 day

Your roof next

Want resultslike these?